This large hydro turbine unit is located on the Warrior River southwest in Southwest, AL. The hydro plant was built over 100 years ago. Hope Power & Industrial provided all specialty craft and supervision to perform the disassembly of all generator and turbine components, supporting machining of embed surfaces back to level. Reassembly of new one-piece solid turbine unit including generator stator and rotor reassembly. The unit was successfully commissioned and continues to operate as designed.
Web Design by Drum Creative